Electrical maintenance is about knowing the condition of your installation and acting before problems become failures. For businesses and landlords, it is also about being able to show that the installation has been maintained.

What a maintenance programme includes

  • Periodic inspection and testing (EICRs) at the interval recommended for your premises
  • Emergency lighting functional tests and annual full-duration tests, with logbook entries
  • RCD testing and checks on critical circuits
  • Remedial work identified by inspections, prioritised by risk and quoted item by item
  • Records kept together, with a programme of what is due next

Why planned maintenance

Unplanned shutdowns cost more than planned ones. Inspections find loose connections, damaged cables and overloaded circuits before they cause a failure, and work can be scheduled when it suits the business.

Insurers, landlords and enforcing authorities may ask for evidence that the electrical installation has been inspected and maintained. A maintenance programme gives you that evidence in one place.

For landlords

Private landlords in England must have the electrical installation in rented homes inspected at least every five years, and supply reports to tenants. See electrical testing and EICRs for details. For portfolios, a single programme keeps every property in date.

FAQs

Electrical maintenance: questions

How often should a commercial installation be inspected?

It depends on the type of premises and how it is used. The interval is recommended on your last EICR. IET guidance gives typical maximum intervals for different types of building, and some, such as those used by the public, are inspected more often.

Can you look after several properties?

Yes. A single programme with due dates across all your properties is easier to manage than individual reminders.

Do you keep records for us?

You receive copies of every certificate and test record. We can also maintain a schedule showing what is due and when.

Planning electrical work? Let’s talk.

Tell us what you need, from one extra socket to a full new-build installation, and we will come back to you.

Get a quote